Operational Framework
Three Verticals
1.Last Mile Connectivity and Augmentation Projects
- Increase the share of cargo moved through Railways
- Addition, alteration, improvement in last mile connectivity to and from Ports
- Projects to be funded completely by Ports, being the sole beneficiary
2.Augmentation and Operation & Maintenance of Internal Port Rail Systems
- Strengthen existing infrastructure for faster evacuation of dedicated cargo
- Bring incremental improvements in turnaround time and other performance indicators
- Incremental reduction in manpower and improvement in productivity
3.Hinterland Connectivity Projects
- Equity participation in large scale, multi-beneficiary connectivity projects: Salegaon-Paradip, Indore-Manmad, etc.
- Leverage the Participative Models of Railways: JV Model, NGR (Non-Govt. Railway) Model, etc.