Current Projects
S. No | Name of project | Port | Cost in Crores INR |
---|---|---|---|
1 | Development of Common Rail Yard JNPT | JNPT | INR 250 Crore |
2 | Railway Connectivity to 4th Terminal | JNPT | INR 100 Crores |
3 | Jasai-JNPT 3rd Line work | JNPT | INR 150 Crores (Approx.) |
Projects
S. No | Name of project | Port | Cost in Crores INR |
---|---|---|---|
1 | Upgradation of the Track Nos. 10,12,14, 16, 18,19,20,21, 22 and 23 at EJC yard | Kolkata Port Trust | 34.35 |
2 | Modernization and up-gradation of the existing railway network at Kolkata Dock System (KDS) | Kolkata Port Trust | 8.72 |
3 | Doubling of Railway line from DurgaChak to Haldia Dock Complex. | Kolkata Port Trust | 78 |
4 | Providing railway connectivity from the port to the Power Plants | V.O. Chidambaranar Port Trust | 200 (Approx) |
5 | Last mile rail /road connectivity for development of Enayam Port in Kanyakumari District. | Colachel Port | 300 (Approx) |
6 | Providing railway track between Marshalling Yard and Hare Island | V.O. Chidambaranar Port Trust | 70.12 |
7 | Northern rail link from Minjur station | Kamarajar Port | 300 |
8 | Augmentation/doubling of southern connectivity to KPL | Kamarajar Port | 150 (Approx) for Southern Connectivity |
9 | Laying of new railway track at west of western yard I and laying paving block PF in between new track and western yard I | Chennai Port Trust | 12.68 |
10 | Extension of rail track No. 13, 14, & 15 | Kandla Port Trust | 29.52 |
11 | Rail connectivity to berth No. 13, 14, 15 & 16 from take –off point to west end of berth | Kandla Port Trust | 129.13 |
12 | Heavy Haul Corridor for Salegaon to Paradip Port Trust. | Paradip Port Trust | 3200 |
13 | Additional Line no. 1 E on the eastern side of the R&D Yard | Visakhapatnam Port Trust | 20.15 |
14 | Extension of line No.11to 15 to full length at R&D yard | Visakhapatnam Port Trust | 30 |
15 | Signaling works : i)RRI at R&D yard . ii)Panel interlocking at ‘B’ Cabin. iii)Panel interlocking at 14 Level goompty. iv)Panel interlocking at dumper cabin. Service building and glued joints | Visakhapatnam Port Trust | 35.74 |
16 | Electrification of VPT railway line 45.143 TKM | Visakhapatnam Port Trust | 30 |
17 | Providing direct connection between OEC and Western sector joining at NAD curve from E.Co. Railway | Visakhapatnam Port Trust | 16.75 |
18 | Connection of dead end line at North of R& D yard to Eastern Grid (Third line) from E.Co. Railways | Visakhapatnam Port Trust | 9.28 |
19 | Direct connectivity to Mindi Yard from E.Co. Railways/ SC Railways | Visakhapatnam Port Trust | 276 |
20 | Up-gradation of Platform no.2 & 3 in the Port Marshalling yard | New Mangalore Port Trust | 7.34 |
21 | Up-gradation of Railway Line 1 &2 | ||
22 | Up –gradation modifications of ICD yards | Jawaharlal Nehru Port Trust | 235 |
23 | Rail Connectivity to Vardha Dry Port | Jawaharlal Nehru Port Trust | 100 |
24 | Rail Connectivity to Jalna Dry Port | Jawaharlal Nehru Port Trust | 100 |
25 | 3rd Line between Jasai and JNPT | Jawaharlal Nehru Port Trust | 125 |
Total Cost | 5284.38 |
S. No. | Particulars | No.of Projects | Cost (approx) INR Crores |
A | WORKS ALREADY COMMENCED | 8 | 159.24 |
B | DPR UNDER FINALIZATION, BIDS TO BE INVITED BY DECEMBER 2016. CONTRACTS ARE LIKELY TO BE FINALIZED BY MARCH 2017 | 4 | 571.13 |
C | DPR UNDER FINALIZATION AND BIDS SHALL BE INVITED DURING 2017-18 | 7 | 4326 |
D | DPR HAS BEEN FINALISED. THE WORKS HAD BEEN HELD IN ABEYANCE BY PORT | 6 | 228.01 |
TOTAL | 25 | 5284.38 | |
E | WORKS WHICH ARE TAKEN UP FOR FEASIBILITY STUDIES | 2 | 15000 |
A. WORKS ALREADY COMMENCED. 8 (Eight)
S. No. | Name of project | Port | Cost in Crores INR |
1 | Upgradation of the Track Nos. 10,12,14, 16, 18,19,20,21, 22 and 23 at EJC yard | Kolkata Port Trust | 34.35 |
2 | Modernization and up-gradation of the existing railway network at Kolkata Dock System (KDS) | Kolkata Port Trust | 8.72 |
3 | Providing railway track between Marshalling Yard and Hare Island | V.O. Chidambaranar Port Trust | 70.12 |
4 | Laying of new railway track at west of western yard I and laying paving block PF in between new track and western yard I | Chennai Port Trust | 12.68 |
5 | Providing direct connection between OEC and Western sector joining at NAD curve from E.Co. Railway | Visakhapatnam Port Trust | 16.75 |
6 | Connection of dead end line at North of R& D yard to Eastern Grid (Third line) from E.Co. Railways | Visakhapatnam Port Trust | 9.28 |
7 | Up-gradation of Platform no.2 & 3 in the Port Marshalling yard | 7.34 | |
8 | Up-gradation of Railway Line 1 &2 | ||
Total Cost | 159.24 |
B.DPR UNDER FINALIZATION, BIDS TO BE INVITED BY DECEMBER 2016. CONTRACTS ARE LIKELY TO BE FINALIZED BY MARCH 2017: 4 (FOUR)
S. No. | Name of project | Port | Cost in Crores INR | |
1 | Doubling of Railway line from DurgaChak to Haldia Dock Complex. | Kolkata Port Trust | 82 | |
2 | Rail rail connectivity to berth No. 13, 14, 15 & 16 from take –off point to west end of berth | Kandla Port Trust | 129.13 | |
3 | Up –gradation modifications of ICD yards | Jawaharlal Nehru Port Trust | 235 | |
4 | 3 | Jawaharlal Nehru Port Trust | 125 | |
Total Cost | 571.13 |
C.DPR UNDER FINALIZATION AND BIDS SHALL BE INVITED DURING 2017-18 (Subject to financial closure) : 7 (Seven)
S. No | Name of project | Port | Cost in Crores INR |
1 | Providing railway connectivity from the port to the Power Plants | V.O. Chidambaranar Port Trust | 200 (Approx) |
2 | Last mile rail /road connectivity for development of Enayam Port in Kanyakumari District. | Colachel Port | 300 (Approx) |
3 | Direct connectivity to Mindi Yard from E.Co. Railways/ SC Railways | Visakhapatnam Port Trust | 76 |
4 | Northern rail link from Minjur station | Kamarajar Port | 150 (Approx) for Southern Connectivity |
5 | Heavy Haul Corridor for Salegaon to Paradip Port Trust. | Paradip Port Trust | 3200 |
6 | Rail Connectivity to Vardha Dry Port | Jawaharlal Nehru Port Trust | 100 |
7 | Rail Connectivity to Jalna Dry Port | Jawaharlal Nehru Port Trust | 100 |
Total Cost | 4326 |
D. DPR HAS BEEN FINALISED. THE WORKS UNDER REVIEW BY PORT: 6 (Six)
S. No | Name of project | Port | Cost in Crores INR |
1 | Single line Rail connectivity project from Basulaia to Shalukkhali | Kolkata Port Trust | 82.6 |
2 | Extension of rail track No. 13, 14, & 15 | Kandla Port Trust | 29.52 |
3 | Additional Line no. 1 E on the eastern side of the R&D Yard | Visakhapatnam Port Trust | 20.15 |
4 | Extension of line No.11to 15 to full length at R&D yard | Visakhapatnam Port Trust | 30 |
5 | Signaling works : v)RRI at R&D yard . vi)Panel interlocking at ‘B’ Cabin. vii)Panel interlocking at 14 Level goompty. viii)Panel interlocking at dumper cabin. Service building and glued joints | Visakhapatnam Port Trust | 35.74 |
6 | Electrification of VPT railway line 45.143 TKM | Visakhapatnam Port Trust | 30 |
Total Cost | 228.01 |
Following works given to IPRCL for feasibility study
S. No | Port | Project | Estimated Cost (Rs. In Crores) | Track Km |
1. | JNPT | Indore-Manmad And Manmad-Mumbai /JNPT Connectivity | Rs12000 Cr (approx) | JNPT/Mumbai to Manmad= 300 Km |
2. | Kandla PT | Jaisalmer-Gandhidham New rail connectivity | Rs3000 Cr (approx) | 400 Km |
Rs 15,000 Cr | 700 Km |